1 – Load of steel heading for Dublin
2 – Steel being unloaded on site
3 – Steel being unloaded from truck in through pedestrian door opening
4 – Steel coming through door opening
4b – Steel being prepared for rigging
5 – Steel being lowered down escalator
5b – Steel on its way!
5c – Nearly there….
6 – Steel being lowered further down the escalator
7 – Touchdown
8 – Part of the steel load in position in the basement for installation
9 – Installation of steel begins
10 – Lifting beams into position
10 b – Lifting beams into position
11 – Completed steel connections
12 – Voids left in steel structure to allow for services which were taken into account at site measurement stage
13 – Concrete cutout complete as steel supports the precast floor
14 – View of overall steel work
15 – Voids left for services